Perth concrete pool builders since 1990
Imperial Pools was established in 1990 and is one of the longest-standing concrete pool companies in Western Australia.
Your pool, built around your site.
We have been SPASA members for more than 20 years. Our clients range from private homeowners and builders to commercial construction companies, architects and designers.
It is your pool, so we help at every step to make sure it fits your budget as well as your plans. Because we build in concrete, the pool can sit on the boundary, form part of the foundations of your house, or go inside your home.
We supply and install the equipment, from filtration through to our range of finishes. You are welcome to visit the office in Darch during business hours.
SPASA WA Concrete Pool Builder of the Year 2019. WA Pool of the Year, seven National Awards, and Bronze, Silver and Gold SPASA awards.
The build schedule, start to finish
The sequence Imperial Pools publishes. The deposit and three invoices are tied to finished stages, marked in gold.
| Stage | What happens | Time | Payment |
|---|---|---|---|
| Site plan | Once you accept the quote, send a surveyed site plan at 1:100 or 1:200 showing boundaries, retaining walls, the existing or proposed house, and finished floor and ground levels. | Before work | |
| Contract | We prepare a SPASA of WA contract and post it to you. Return it signed with your deposit before construction can start. | Before work | Deposit |
| Licence and sewer | We lodge the building licence application with your local shire and apply to the Water Corporation to locate the main sewer. | 2–4 weeks | |
| Site inspection | Our construction manager confirms dimensions, depths and any site works. If the property needs surveying and the pool pegged out, that is an added cost. | One visit | |
| Form, steel, concrete | Excavation is scheduled and the shell is formed, reinforced and poured, then left to cure. | 7–10 days cure | Invoice 1 |
| Your items | Arrange what the contract does not usually include: temporary fencing of the shell, power points, soak-wells for backwash and leveller overflow, isolation fencing, and any water features, retaining walls or garden beds. | Between stages | |
| Pre-plumbing and backfill | After curing, pre-plumbing is completed and the shell is backfilled. | After cure | |
| Tiles and coping | Choose your tiles and coping; they are laid once materials are on site. | 2–3 days | Invoice 2 |
| Heating, paving, fencing | Solar heating, if chosen, is installed. Paving, landscaping and isolation fencing must be in place: the pool cannot be plastered until the fencing is up. | Your trades | |
| Plaster day | Our team cleans and checks the site the day before. The interior is plastered and the equipment plumbed on the same day; a notice tells you when to start filling. | 1 day | |
| Fill | Once the water is on it must not be stopped until it covers at least three quarters of the waterline tile. | 16–36 hours | |
| Handover | Book handover with our pool technician, who balances the water and shows you how to run and maintain the pool and equipment. Warranties are left in the equipment area. | On site | Invoice 3 |
Happy swimming from the staff at Imperial Pools. If you have questions after completion, contact the office any time.
Better yet, see us in person.
The office is at 1/1 Furniss Road, Darch, open Monday to Friday, 9am to 3pm. Once you accept the quote, the first thing we need is a surveyed site plan at 1:100 or 1:200.