Imperial Pools

Concrete pools on the boundary, in the foundations or inside your home.

Imperial Pools has designed and built concrete pools in Perth since 1990, for homeowners, builders, architects and designers.

Concrete Pool Builder of the Year 2019SPASA Western Australia
Acrylic-walled pool edge holding the water against the ocean horizon, North Beach, Perth.Open larger photo

North Beach

A beachfront home with three kinds of water: a sun shelf, an acrylic edge against the ocean, and a raised lap pool along the house.

Above: the acrylic edge, level with the horizon.

Sun shelf with in-pool loungers beside a glass-edged pool, North Beach, Perth.Open larger photo
The sun shelf, with in-pool loungers.
Elevated lap pool with an acrylic end wall beside stacked-stone cladding, North Beach, Perth.Open larger photo
The raised lap pool and its acrylic end window.

Built to suit your area and needs

Wet edges and spas, courtyard plunge pools, indoor and resort pools. Each is poured in concrete and designed around the site it sits on.

Builders we work with: Prowest, Distinctive Homes WA, Calautti Homes, Spadaccini Homes, Azure, Humphrey Homes, Atrium Homes, Beaumonde Homes and Maek.

SPASA Western Australia Concrete Pool Builder of the Year 2019 award certificate.

Concrete Pool Builder of the Year 2019

SPASA Western Australia

WA Pool of the Year. Seven National Awards. Bronze, Silver and Gold SPASA awards. A SPASA member for more than 20 years.

Rows of framed award certificates on the walls of the Imperial Pools office in Darch.
The award wall at the Imperial Pools office in Darch.

Winners of Gold SPASA Awards

From the pools Imperial Pools lists under its Gold SPASA awards.

Raised pool with frameless glass on a terraced block, Perth. Built by Imperial Pools.Open larger photo
Raised pool with frameless glass on a terraced block.
Raised pool clad in black tile, brimming at the edge, Perth. Built by Imperial Pools.Open larger photo
Raised pool clad in black tile, brimming at the edge.
Curved pool at dusk beside travertine paving, Perth. Built by Imperial Pools.Open larger photo
Curved pool at dusk beside travertine paving.
Infinity edge with a hardwood deck and suburban views, Perth. Built by Imperial Pools.Open larger photo
Infinity edge with a hardwood deck and suburban views.
Raised rendered spa spilling into the pool, Perth. Built by Imperial Pools.Open larger photo
Raised rendered spa spilling into the pool.

See 16 award-page pools in the gallery

Start to finish

From your first call to handover. You pay a deposit with the contract, then three invoices, each when a stage is finished.

Not usually in the contract: temporary and isolation fencing, power points, soak-wells, water features and retaining walls. The full build schedule

  1. Monday to Friday, 9am to 3pm

    Call or visit the office

    Call the office in Darch or visit during business hours. The steps below begin once you accept the quote.

    Can I visit before I decide?

    Yes. Our office is at 1/1 Furniss Road, Darch, open Monday to Friday, 9am to 3pm. You can also call (08) 9303 4214 or email sales@imperialpools.com.au.

  2. Once you accept the quote

    Site plan

    A surveyed plan at 1:100 or 1:200, showing boundaries, levels and the house.

    What do I need to give you before construction starts?

    A surveyed site plan of the property at 1:100 or 1:200. It should show all boundaries and retaining walls, the existing or proposed house, and the finished floor and ground levels. The signed SPASA of WA contract and your deposit must reach our office before work begins.

  3. Licence usually 2 to 4 weeks

    Contract and licence

    Deposit

    SPASA of WA contract with your deposit; we lodge the building licence with your shire.

    How long does council approval take for a pool in Perth?

    After you accept the quote and sign the contract, we prepare and lodge the building licence application with your local shire. Approval is usually granted within 2 to 4 weeks. We also apply to the Water Corporation to locate the main sewer before excavation.

  4. After the site inspection

    Excavation

    Dimensions and depths checked on site with our construction manager, then the dig.

    Aerial view of a resort pool under construction, with the excavated shell.
  5. Stage one

    Form and steel

    The first stage of construction: form, steel, concrete.

    Steel reinforcement inside curved formwork before the concrete pour.
  6. Cures 7 to 10 days

    Concrete

    Invoice 1

    The shell is poured and left to cure.

    What is not usually included in the pool contract?

    Temporary fencing around the shell if required, power points for the pump, filter and other equipment, soak-wells for the filter backwash and water leveller overflow, isolation fencing, and any water features, retaining walls or garden beds built into the design.

    Freshly poured concrete pool shell with curved entry steps.
  7. Usually 2 to 3 days

    Tiles and coping

    Invoice 2

    Pre-plumbing and backfill, then your chosen tiles and coping.

    Mosaic waterline tiles and pale coping on a finished pool, Mount Richon.
  8. Filling 16 to 36 hours

    Plaster and fill

    Fencing up first. Plastered and plumbed in a day, then the water goes on.

    Filled lap pool with a mosaic bench, East Victoria Park.
  9. On site

    Handover

    Invoice 3

    Water balanced, equipment explained, warranties left in the equipment area.

    How are payments staged?

    A deposit is paid with the signed contract. Payment 1 is invoiced once the concrete shell is poured, payment 2 after tiling and coping, and the final payment 3 at handover, when the warranties for your equipment are left on site.

    Finished pool and square spa, Gnangarra.